Cliffs
Survey Results

Survey Results (Phase 1)

All 220 Arizona school districts responded to the SFB Flooring Survey Summary, of which 73 school districts (33.18%) reported the presence of at least one "potential" rubber floor of concern. In total, 176 potential floors were reported.

In response to these results, the Multi-Agency Task Force (SFB/ADEQ/ADHS) established next steps as Assessment (Phase 2) and Testing (Phase 3). Phase 2 includes development of the assessment requirements and the procurement of flooring specialists to identify and document each floor.  The results of Phase 2 determine whether proceeding to Phase 3 is necessary as some floors may not be the type that require further action.